Starting to install the inner frames and sanded them down using a custom made tool to make sure all of them have the same length
Custom made tool details: 2 drills (0,8mm in diameter) taped together to be able to hold it during the grinding process
The seccond frame is added and grinded down with the same custom made tool but this time using drills1,5mm in diameter
side by side with the frame supplied by the kit
the backside..
only the rest remains...
No comments:
Post a Comment