I started to divide the hull on 3 of the middle frames into 20mm sections where app. 4 “full” planks should be fitted
After this I used a 1mm thick flexible lath and pinned it onto the 3 marked frames and bend the lath in a natural but “straight” line towards the bow
& stern and marked the position.
The idea is to equally tapper 4 planks in such a way that they will fill out an marked section.
When needed i will use drop planks and stealers to achieve the best result
No comments:
Post a Comment